Jurong Lake District is the 410 ha area around Jurong East MRT and Jurong Lake that URA is turning into the biggest business district outside the city. I went through URA’s own documents, including the planning guide it released in July 2026, and put the useful parts in one place. Every number links to where it came from.

Last updated 15 Oct 2026.

Artist’s impression of the Jurong Lake District waterfront and skyline
Artist’s impression, not an official rendering

Jurong Lake District in numbers

  • 410 ha
    total area of the district[1]
  • 100,000
    new jobs when fully built[2]
  • 20,000
    new homes when fully built[2]
  • 4
    MRT lines by 2032[3]
  • 1.4m sqm
    office space planned, up from about 200,000 sqm[2]
  • 85%
    of trips by walking, cycling or public transport by 2035[2]

For scale: URA’s figures put existing office space at about 200,000 sqm in Jurong Lake District, the same as Paya Lebar Central and more than Tampines (130,000 sqm) or Woodlands (70,000 sqm). The 1.4 million sqm planned is still about a quarter of the Downtown Core’s 5.2 million.[2]

What’s in the district

Jurong Lake District is really four areas joined together.

Jurong Gateway

The part that already exists, around Jurong East MRT. JEM, Westgate, IMM, offices, Ng Teng Fong General Hospital and about 2,000 homes. MND puts the office space here at about 185,000 sqm today.

Jurong Lake Central (the new precinct)

About 120 ha of mostly empty land south of Jurong Town Hall Road, between Jurong Gateway and the lake. This is where most of the new offices, homes, shops and hotels will go over the next few decades. Earlier plans called it Lakeside East.

Jurong Lake Gardens and the lake

The 90 ha national garden around Jurong Lake, the Chinese and Japanese Gardens, and the new Science Centre. More than 10 km of waterfront runs around the lake.

International Business Park

Business park space west of the gardens, in use since the 1990s. URA plans to bring in more mixed uses over time.

Sources: MND, 3 Jun 2026, URA planning guide, Jul 2026, JLD website.

How we got here, and what’s next

The plan has been around since 2008 and has changed course more than once. Items in grey haven’t happened yet.

  1. 1960s

    Jurong becomes Singapore’s first big industrial estate

    Swamp, farms and fish ponds are turned into factories under Dr Goh Keng Swee. Jurong Town Hall follows in 1974.[1]

  2. 1991

    Concept Plan names Jurong a regional centre

    The idea of moving jobs out of the city centre and closer to where people live starts here.[1]

  3. 2008

    Jurong Lake District is announced

    Master Plan 2008 joins the commercial Jurong Gateway and the leisure area around the lake into one 410 ha district.[1]

  4. 2015

    High-speed rail terminus picked for Jurong East

    Singapore chooses Jurong East for the KL–Singapore High-Speed Rail terminus, and plans for the district are drawn around it.

  5. 1 Jan 2021

    High-speed rail project ends

    Both governments announce the HSR agreement has lapsed. The land set aside for it becomes part of the new precinct plans.[14]

  6. Jun 2023

    Master developer site launched

    URA puts a 6.5 ha white site beside Jurong East MRT up for tender, hoping one developer would kick-start the new precinct.[6]

  7. Sep 2024

    Master developer site not awarded

    Only one consortium bid. URA rejected it because the price, $6,888.90 per sqm of floor area (about $640 psf ppr), was too low.[7]

  8. 2024

    Jurong Lake Gardens fully reopened

    Work on the Chinese and Japanese Gardens is finished, completing the 90 ha national garden.[2]

  9. Jul 2026

    Smaller white site at Town Hall Link launched

    A 3.72 ha piece of the old master developer site goes out to tender, with offices and up to 1,200 homes. URA also publishes a new planning and urban design guide for the district.[4]

  10. 17 Nov 2026

    Town Hall Link tender closes

    The first big test of developer interest in the new precinct since 2024.[4]

  11. Dec 2026

    Jurong East Avenue 1 EC site goes to tender

    About 735 EC homes about 500 m from Toh Guan station, just outside the district boundary.[3]

  12. Mid-2028

    Jurong Region Line opens, Jurong Gateway Hub completes

    JRL stages 1 and 2 open, including Toh Guan, Jurong East and Jurong Town Hall stations. The hub next to Jurong East MRT brings a bus interchange, regional library, community club, sports facilities, offices and shops.[11]

  13. Around 2027–2028

    New Science Centre opens

    The Zaha Hadid Architects design beside Chinese Garden MRT. MOE first said around 2027. URA’s July 2026 guide says around 2028.[2]

  14. 2032

    Cross Island Line Phase 2 opens

    A new Jurong Lake District station links the area to the north-east, the east and, later, Changi Airport Terminal 5.[12]

  15. 2030s

    Government offices may move in

    URA lists the Ministry of National Development and the Ministry of Sustainability and the Environment as under study.[2]

  16. 2040s and beyond

    District fully built

    URA expects the full 100,000 jobs and 20,000 homes over 20 to 30 years and beyond.[2]

Jurong Lake Central, the new 120 ha precinct

Most of the change will happen south of Jurong Town Hall Road, on about 120 ha of land between Jurong Gateway and the lake. URA calls it Jurong Lake Central. It will have offices, homes, shops, hotels and entertainment, and it will connect to Jurong East MRT through bridges, an underground link and tree-lined streets.[2]

The July 2026 planning guide sets some rules that will shape what it feels like on the ground:[2]

  • The whole district is gazetted as car-lite. The target is for at least 85% of trips to be on foot, by bike or by public transport by 2035.
  • Main roads will be Transit Priority Corridors, with bus-only lanes, wider footpaths and cycling paths. New cycling paths will be 2.5 m wide, wider than today’s 2 m standard.
  • Car parks, drop-off points and loading bays go underground, and basements will connect so cars and lorries don’t need to use the streets.
  • At least 20% of each site has to be an open-air courtyard at ground level, open to the public, with at least a quarter of it planted with trees.
  • Buildings sit right at the street edge with covered walkways, and wind corridors are kept open to cool the area.
  • Everyday needs should be within a 10-minute walk, cycle or bus ride.

The new precinct will also run on a district cooling plant and a pneumatic waste system, both housed in the Town Hall Link development.[3]

Artist’s impression of a transit hub in Jurong Lake District
Artist’s impression

MRT lines and transport

By 2032 the district will be served by four MRT lines. The dates below are LTA’s and URA’s latest. Some older pages still say the Jurong Region Line opens from 2027, but LTA’s page, updated in March 2026, says 2028.

LineStationOpensNote
North-South Line and East-West LineJurong East (interchange)Open nowAbout 1.2 km from the Jurong East EC site
Jurong Region Line, Stage 2Toh Guan (JE4), Jurong East (JE5), Jurong Town HallMid-2028Toh Guan is about 500 m from the EC site
Jurong Region Line, Stages 1 and 3Choa Chu Kang, Boon Lay, Tengah, NTU, Jurong Pier side2028 and 2029Whole line: 25 stations, 24 km
Cross Island Line, Phase 2Jurong Lake District (CR19)2032Later linked to Changi Airport Terminal 5
JRL West Coast ExtensionLinks to the CRL, then the Circle LineLate 2030s, then 2040sURA says this could cut West-to-city journeys by up to 20 minutes

Sources: LTA, URA Master Plan 2025, JLD website, MND.

Jurong Gateway Hub

Right next to Jurong East MRT, the hub that used to be called the Jurong East Integrated Transport Hub is now Jurong Gateway Hub. It is due by 2028 and will have a new bus interchange, a regional library, a community club, sports facilities, offices and shops.[2]

Artist’s impression of Jurong Lake Gardens
Artist’s impression

Gardens, Science Centre and heritage

Jurong Lake Gardens

A 90 ha national garden around the lake, Singapore’s third and the first in the heartlands. Lakeside Garden opened first and won an Urban Land Institute award in 2021. The Chinese and Japanese Gardens reopened after their makeover in 2024. The lake itself is about 70 ha, with more than 10 km of waterfront.[10]

The new Science Centre

Designed by Zaha Hadid Architects with Architects 61, beside Chinese Garden MRT and facing the lake. MOE first said it would open around 2027, the Science Centre’s 50th year.[13] URA’s July 2026 guide now says around 2028.[2]

Jurong Town Hall

Finished in 1974 and designed by Architects Team 3 under Lim Chong Keat, it is a national monument and a symbol of Jurong’s industrial years. URA plans a view corridor and public walkway linking it to the old Science Centre building.[2]

What it means for Jurong East EC

The Jurong East Avenue 1 EC site sits just outside the district, in the Yuhua estate. It’s about 500 m from Toh Guan station, one stop from Jurong East, and about 1.2 km from the interchange itself. So you get the district’s jobs, malls and gardens nearby without living in the middle of a construction zone.

My honest view, as someone who follows this area:

  • The timing lines up. The EC should be ready around 2031. By then the Jurong Region Line (2028), Jurong Gateway Hub (2028) and the new Science Centre should be open, with the Cross Island Line following in 2032.
  • Jobs nearby matter for an EC. With a 10-year MOP, you’ll live here a long time. Having offices growing from about 200,000 sqm to a planned 1.4 million sqm next door makes it easier to live near work.
  • Don’t buy only on the masterplan. The master developer site failed in 2024, and URA itself says full build-out takes 20 to 30 years. Much of the new precinct will still be under construction while you live here.
  • Watch the Town Hall Link result. Strong bids on 17 November would show developers are confident about the district, and could push up land bids nearby, including for the EC site in December.

Walking distances and schools around the EC site
Latest Jurong East EC news

Jurong East EC updates, EC policy and booking

I can help you with:

You don’t pay any commission on a new launch.

Jeffery Ng · CEA Reg. No. R050136D · Huttons Asia Pte Ltd · Licence No. L3008899K

Chat with us today!

I reply on WhatsApp

Jurong Lake District questions

How big is Jurong Lake District?

About 410 hectares, according to URA. That covers Jurong Gateway around Jurong East MRT, the new 120 ha Jurong Lake Central precinct, Jurong Lake Gardens and the International Business Park.

How many jobs and homes will Jurong Lake District have?

URA plans for 100,000 new jobs and 20,000 new homes when the district is fully developed, which it expects to take 20 to 30 years and beyond. Today the area around Jurong East MRT has about 185,000 sqm of office space and about 2,000 homes.

Which MRT lines will serve Jurong Lake District?

Four. The North-South and East-West lines are already at Jurong East. The Jurong Region Line opens in stages from mid-2028, and the Cross Island Line Phase 2 adds a Jurong Lake District station in 2032.

What happened to the Jurong Lake District master developer site?

URA launched a 6.5 ha master developer site in June 2023. The only bid, from a five-developer consortium, came in at about $640 psf ppr, and URA did not award it in September 2024 because the price was too low. In July 2026 URA launched a smaller 3.72 ha piece of it, at Town Hall Link, which closes for bids on 17 November 2026.

When will the new Science Centre open?

MOE and the Science Centre Board first said around 2027. URA’s Jurong Lake District guide from July 2026 says around 2028. It sits beside Chinese Garden MRT on the edge of Jurong Lake.

Is Jurong East EC inside Jurong Lake District?

It is just outside it. The Jurong East Avenue 1 site is in the Yuhua estate, about 500 m from Toh Guan station on the Jurong Region Line and about 1.2 km from Jurong East MRT, the heart of Jurong Gateway.

Is Jurong Lake District a second CBD?

People often call it that, but URA’s own wording is the largest mixed-use business district outside the city centre. It is meant to bring jobs closer to the million or so people living in the West.

Sources

All checked on 15 October 2026. Where sources disagree, I’ve said so above and gone with the newest official one.

  1. [1] URA, Jurong Lake District (Shaping our city), updated 3 Aug 2026
  2. [2] URA, Jurong Lake District Planning and Urban Design Guide, Jul 2026
  3. [3] MND / URA, 2H2026 Government Land Sales Programme (press release), 3 Jun 2026
  4. [4] URA, Launch of White site to advance development of Jurong Lake District, 3 Jul 2026
  5. [5] URA, Town Hall Link site details (Annex A), 3 Jul 2026
  6. [6] URA, URA launches tender for a Master Developer site at Jurong Lake District, 22 Jun 2023
  7. [7] URA, No award for tender of master developer site at Jurong Lake District, 13 Sep 2024
  8. [8] URA, Potential (JLD website), accessed 15 Oct 2026
  9. [9] URA, Next strategic move (JLD website), updated 7 Jul 2026
  10. [10] URA, Experience (JLD website), updated 19 Jun 2026
  11. [11] LTA, Jurong Region Line, updated 17 Mar 2026
  12. [12] URA, Master Plan 2025, West Region: More convenient and connected homes, updated 2 Jun 2026
  13. [13] MOE / Science Centre Board, New Science Centre in Jurong Lake District to open around 2027, 2 Dec 2022